We want to make sure YOUR EXPERIENCE with Lifeline Roofing Systems goes smoothly and effortlessly. The following list should be helpful in preparing you for the upcoming project. Anytime you have questions during the process contact us at 936-648-9842.
Before Install:
- - Lifeline representative will contact you to arrange the date of your project & answer any questions you may have concerning the installation of your new roof.
- - The day before installation, the material will arrive on pallets. These are placed in the driveway & will approximately take up the space of a car.
- - Crews arrive first thing in the morning to install. We will take measures to protect your property by placing plywood against the windows and use tarps to cover landscaping. Trimming tall grass or landscaping before installation is preferred to ensure exceptional clean-up from debris.
During Install:
- - Vibrations may affect the interior of your house, particularly cathedral ceilings. We can do our best to prevent this from happening, but some nail pops, or other drywall/plaster damage may occur for which LRS is not responsible.
- - We may need access to electrical sockets to help enable us to keep the worksite clean.
- - The removal and installation of shingles/attic vents will create dust and debris in your attic. Please be sure your attic & its contents are protected. Also note, if you are receiving a new skylight, some debris may fall into your house. Please take care to cover/move items near the skylight. In addition, any interior trim work needed or cost from a skylight replacement will be the homeowner’s responsibility.
- - Gutter screens will not look the same if reused. Some manufacturers require homeowners to use their installers ONLY to remove/re-install their product to keep their warranty intact.
After Install:
- - A Lifeline Roofing Systems representative will oversee installed roof portion to ensure all details are addressed accordingly.
- - Gutters are cleared of debris, blowers used to clear driveways/walkways free of debris, and a magnet is used to pick up any remaining work-related debris. Any furniture moved is reset and property is returned to its original state.
- - Please plan to inspect your roof with the supervisor when the roof is complete. This will allow you to ask questions and will allow us to address your concerns while on site.